Building access
Evaluating a lift route across a raised floor or mezzanine
Raised access panels, supports, joints and the structure below them form one floor system. A room's published uniform-load rating cannot establish that a lift may use the route.

Submit the complete route for review
Identify the machine's maximum wheel loads, tyre contact area and support reactions for the intended configurations. Mark access covers, thresholds and stopping locations on a floor plan. Obtain a site-specific assessment from the building's structural reviewer before choosing a route.
Details to record
- Floor construction along every route segment
- Equipment configuration and maximum reactions
- Approval for travel and stationary work
Can a lift travel or work on a raised floor or mezzanine?
Provide the route, work position, maximum wheel load, contact area and operating configuration for review against the panels, supports and underlying structure. A uniform floor-load rating alone does not establish suitability.