Vertical mast lifts

Allowing room for mast lift outriggers

A mast lift may reach the maintenance bay and still have insufficient room to deploy its supports. The setup drawing is essential where racks or walls surround the work point.

DL double-mast lift

Measure the support layout in both directions

Compare the manufacturer's deployed length and width with the clear area at the actual station. Allow for pipework, skirtings, equipment bases and access to controls. Ask for the support reactions separately when the floor capacity also needs assessment.

Body width and deployed footprint

MeasurementL single-mast range
Body width825 mm
Deployed outrigger envelope1,925 × 1,750 mm

Use the first dimension for a straight passage check. Use the second pair, plus applicable clearances, when drawing the working position.

Details to record

  • Dimensioned drawing of deployed supports
  • Clear distance to walls and machine bases
  • Structural assessment of support reactions

Why measure outrigger space if the mast lift fits the doorway?

Transport width tells you whether the stowed machine can pass. An outrigger model also needs room at the workstation for its deployed footprint, nearby walls and operator access. Check the layout drawing for that model.