Building access
Planning high-level maintenance in hotels and offices
Hotel and office maintenance teams move equipment through space used by guests, tenants and building services. The route to a ceiling fitting can be more restrictive than the height itself.

Plan for the building in use
Record lift lobby turns, thresholds, finished flooring, door closers and internal elevator dimensions. Map the tool load and proposed working position. Agree where the machine will be stored and how the work area will be separated from building users.
Details to record
- Smallest lobby turn and clear doorway
- Elevator load and cabin space if used
- Work windows and floor protection requirements
Can the lift travel in our building elevator?
Measure the clear doorway, car interior and approach space, and record the elevator's rated load. Compare these with the actual transport dimensions and total transported weight. Have the building operator confirm the route and floor conditions.